Skip to content
Trafo Power & Electricals Pvt. Ltd.

Manufacturing

Every stage, under one roof

From steel plate to tested transformer at Sikandra, Agra.

Technicians assembling transformers on the Trafo Power shop floor

Process

From steel plate to test bay

  1. 01

    Design

    3D mechanical design; every special unit is engineered afresh.

  2. 02

    Core and winding

    HT and LT coils wound and assembled on the core.

  3. 03

    Tanks and radiators

    CNC cutting, PLC seam welding, radiator and fin-wall lines.

  4. 04

    Drying

    Vacuum oven drives moisture out of the insulation.

  5. 05

    Painting

    Abrasive blasting, then epoxy coating to ISO 12944.

  6. 06

    Testing

    Routine tests on every unit; type tests at CPRI or ERDA.

  7. 07

    Dispatch

    Cranes up to 20 t; radiators shipped nitrogen-filled.

Distribution transformers lined up in the Trafo Power assembly hall
Aerial view of the Trafo Power transformer works
Rows of distribution transformers with bushings and conservators
Technician assembling transformer bushings and brass terminals

Prefer an interactive view? See how a transformer is built.

Facilities

Plant and equipment

Production

  • Vacuum oven for transformer drying
  • HT winding machines
  • LT winding machines
  • Abrasive blasting
  • Spray and flood painting
  • Powder-coating line
  • ESAB TIG and MIG welding
  • PLC-controlled seam welding
  • Automatic radiator line
  • Two corrugated fin-wall lines

Testing

  • Transformer testing panel
  • Yokogawa power analyser
  • Tan delta test equipment
  • Transformer oil tester
  • Transformer oil filter machine
  • DVDF test set

Handling

  • Overhead cranes: 2 t, 5 t, 10 t and 20 t
Total shop floor
9,411 sq ft
Machine shop
715 m²
Covered storage
315 m²
Open storage
600 m²

Visit or audit our factory

Arrange a factory visit, inspection or vendor audit with our team.