Manufacturing
Every stage, under one roof
From steel plate to tested transformer at Sikandra, Agra.

Process
From steel plate to test bay
01
Design
3D mechanical design; every special unit is engineered afresh.
02
Core and winding
HT and LT coils wound and assembled on the core.
03
Tanks and radiators
CNC cutting, PLC seam welding, radiator and fin-wall lines.
04
Drying
Vacuum oven drives moisture out of the insulation.
05
Painting
Abrasive blasting, then epoxy coating to ISO 12944.
06
Testing
Routine tests on every unit; type tests at CPRI or ERDA.
07
Dispatch
Cranes up to 20 t; radiators shipped nitrogen-filled.




Prefer an interactive view? See how a transformer is built.
Facilities
Plant and equipment
Production
- Vacuum oven for transformer drying
- HT winding machines
- LT winding machines
- Abrasive blasting
- Spray and flood painting
- Powder-coating line
- ESAB TIG and MIG welding
- PLC-controlled seam welding
- Automatic radiator line
- Two corrugated fin-wall lines
Testing
- Transformer testing panel
- Yokogawa power analyser
- Tan delta test equipment
- Transformer oil tester
- Transformer oil filter machine
- DVDF test set
Handling
- Overhead cranes: 2 t, 5 t, 10 t and 20 t
- Total shop floor
- 9,411 sq ft
- Machine shop
- 715 m²
- Covered storage
- 315 m²
- Open storage
- 600 m²
Visit or audit our factory
Arrange a factory visit, inspection or vendor audit with our team.