Skip to content
Trafo Power and Electricals Pvt. Ltd.

Wind energy

Wind projects: engineering review first.

Wind step-up transformers face variable loading, converter harmonics and harsh environments. Our engineers review every wind enquiry before we quote.

Wind farm with turbines across open land

Wind transformers are engineered for each project. Share your turbine, converter and site data, and we will confirm the scope and ratings we can offer.

Why wind is different

Output follows the wind, so transformers cycle constantly between light load and full output. Power converters introduce harmonics and fast transients, and turbine-mounted units experience vibration.

Coastal and offshore sites add humidity, salt and condensation; tower and nacelle installations limit size, weight and the choice of insulating liquid.

Standards to plan for

IEC 60076-16 sets requirements for transformers in wind turbine applications in addition to the general IEC 60076 series. Grid-operator requirements at the point of connection also apply.

Specifying

What to include in your enquiry

General engineering guidance — final designs are confirmed against your project specification.

Location

Nacelle, tower base or external pad-mounted — each changes size, cooling and fire-safety needs.

Converter

Type and harmonic spectrum of the turbine converter.

Environment

Humidity, salinity, temperature range and altitude.

Collection system

Collection voltage, tapping, vector group and earthing.

Enquire

Tell us about the project

Technical requirements (as known)

kVA or MVA